Rehabiliation and construction of highway and railway bridges

project
In Progress
Category: Rehabilitation and construction of highway and railway bridges
31.12.2024

Construction of new bridge from Kedia street to Javakhishvili turn on territory of Zugdidi Municipality, rehabilitation and reconstruction of Existing streets

The design bridge crossing is articulated girder, 2-span structure, with a scheme 2X16.0m; In a plan, it is designed on a straight line, and in elevation on zero grade—the bridge clearance - 8.5+2X1.5m, the cross-section-12.70m, the total length 33.45m. The bridge has two abutments and one pier.

The design bridge spans will be overlaid with prestressed 16.0m-long reinforced concrete (so-called “composite”) girders. The bridge superstructure is calculated using A-11 and HK-80 loads.

project
In Progress
Category: Rehabilitation and construction of highway and railway bridges
22.08.2024

Construction of a bridge crossing on the road connecting Khabume to Zumi in the village of Khabume, Chkhorotsku Municipality

Construction of a bridge crossing on the road connecting Khabume to Zumi in the village of Khabume, Chkhorotsku Municipality.

project
In Progress
Category: Rehabilitation and construction of highway and railway bridges
14.08.2024

Construction of a road bridge in the Zedavan administrative unit

 Construction of a road bridge in the Zedavan administrative unit

project
In Progress
Category: Rehabilitation and construction of highway and railway bridges
12.12.2022

Construction works of a bridge connecting the villages of Gaghma and Gamoghma Kariata on the Khobistskali River in the Khobi Municipality, Kariata Administrative Unit

Construction works of a bridge connecting the villages of Gaghma and Gamoghma Kariata on the Khobistskali River in the Khobi Municipality, Kariata Administrative Unit

project
In Progress
Category: Rehabilitation and construction of highway and railway bridges

Construction of Poti bridge and access roads

Construction of Poti bridge and access roads 
project
Completed
Category: Rehabilitation and construction of highway and railway bridges
22.07.2023 - 12.08.2024

Provision of a temporary aqueduct by arranging new supports (sheet piles, piles or others methods) and using existing support piers

Provision of a temporary aqueduct by arranging new supports (sheet piles, piles or others methods) and using existing support piers