Rehabiliation and construction of highway and railway bridges
Construction of new bridge from Kedia street to Javakhishvili turn on territory of Zugdidi Municipality, rehabilitation and reconstruction of Existing streets
The design bridge crossing is articulated girder, 2-span structure, with a scheme 2X16.0m; In a plan, it is designed on a straight line, and in elevation on zero grade—the bridge clearance - 8.5+2X1.5m, the cross-section-12.70m, the total length 33.45m. The bridge has two abutments and one pier.
The design bridge spans will be overlaid with prestressed 16.0m-long reinforced concrete (so-called “composite”) girders. The bridge superstructure is calculated using A-11 and HK-80 loads.
Construction of a road bridge in the Zedavan administrative unit
Construction of a road bridge in the Zedavan administrative unit
Construction of Poti bridge and access roads
| Construction of Poti bridge and access roads |
Construction of a bridge crossing on the road connecting Khabume to Zumi in the village of Khabume, Chkhorotsku Municipality
Construction of a bridge crossing on the road connecting Khabume to Zumi in the village of Khabume, Chkhorotsku Municipality.
Provision of a temporary aqueduct by arranging new supports (sheet piles, piles or others methods) and using existing support piers
Provision of a temporary aqueduct by arranging new supports (sheet piles, piles or others methods) and using existing support piers
Manufacturing and installation of steel bridges and connections for the Shorapani- Argveta section within the framework of the construction of the E-60 highway
Manufacturing and installation of steel bridges and connections for the Shorapani- Argveta section within the framework of the construction of the E-60 highway