Construction of bridge in Tbilisi, connecting University Street and Bagebi in Tbilisi
22.05.2024
If you want to become a better writer, you’re in the right place. We’ve compiled our best resources so you can practice your writing skills and take them to the next level.
Your Reliable Partner
About Us
The construction company "Construction Service" LLC has been operating on the market since 2015, the company owns more than 200 different types of construction and installation equipment, two steel and reinforced concrete structure manufacturing factories.
"Construction Service" LLC is the first organization in Georgia that introduced EN and ISO norms in the field of production, the company currently holds four ISO certificates: ISO 9001, ISO 1090-2, EN ISO 3834 and EN ISO 14731.
The company aims to expand its activities both in the Georgian and international markets, since 2023 the products manufactured by "Construction Service" LLC carry CE mark.
Services
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud Ut enim exercitation ullamco laboris nisi ut laborum.Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt
Rehabiliation and construction of highway and railway bridges
Construction of new bridge from Kedia street to Javakhishvili turn on territory of Zugdidi Municipality, rehabilitation and reconstruction of Existing streets
In Progress
Category:
Rehabilitation and construction of highway and railway bridges
31.12.2024
The design bridge crossing is articulated girder, 2-span structure, with a scheme 2X16.0m; In a plan, it is designed on a straight line, and in elevation on zero grade—the bridge clearance - 8.5+2X1.5m, the cross-section-12.70m, the total length 33.45m. The bridge has two abutments and one pier.
The design bridge spans will be overlaid with prestressed 16.0m-long reinforced concrete (so-called “composite”) girders. The bridge superstructure is calculated using A-11 and HK-80 loads.
Construction works of a bridge connecting the villages of Gaghma and Gamoghma Kariata on the Khobistskali River in the Khobi Municipality, Kariata Administrative Unit
In Progress
Category:
Rehabilitation and construction of highway and railway bridges
12.12.2022
Construction works of a bridge connecting the villages of Gaghma and Gamoghma Kariata on the Khobistskali River in the Khobi Municipality, Kariata Administrative Unit
Manufacturing and installation of steel bridges and connections for the Shorapani- Argveta section within the framework of the construction of the E-60 highway
Completed
Category:
Rehabilitation and construction of highway and railway bridges
06.05.2023
-
31.07.2024
Manufacturing and installation of steel bridges and connections for the Shorapani- Argveta section within the framework of the construction of the E-60 highway
Design and construction of new crossings at Zhinvali-Barisakho-Shatili highway of national importance at km 33 - km 51.15, at 110 + 25, 127 + 25 and 128 + 5
Completed
Category:
Rehabilitation and construction of highway and railway bridges
13.09.2019
-
28.02.2022
Design and construction of new crossings at Zhinvali-Barisakho-Shatili highway of national importance at km 33 - km 51.15, at 110 + 25, 127 + 25 and 128 + 5
According to Resolution of the Government of Georgia N773 of April 5, 2019 in Municipality of Abasha. Construction of the automobile bridge in Kolobani destroyed as a result of natural disaster
Completed
Category:
Rehabilitation and construction of highway and railway bridges
18.06.2019
-
01.01.2023
According to Resolution of the Government of Georgia N773 of April 5, 2019 in Municipality of Abasha. Construction of the automobile bridge in Kolobani destroyed as a result of natural disaster
Design and construction of a new bridge crossing over Ksani river at km 40 of Tbilisi-Senaki-Leselidze International Road (border of Russian Federation)
Completed
Category:
Rehabilitation and construction of highway and railway bridges
26.03.2019
-
31.10.2020
Design and construction of a new bridge crossing over Ksani river at km 40 of Tbilisi-Senaki-Leselidze International Road (border of Russian Federation)
Design and construction of new bridge on Vaziani - Martkopi - Norio - Deity's 14th km of the national road (Sh-160) of domestic importance, over the gorge of the river Lochini
Completed
Category:
Rehabilitation and construction of highway and railway bridges
20.02.2018
-
26.06.2018
Design and construction of new bridge on Vaziani - Martkopi - Norio - Deity's 14th km of the national road (Sh-160) of domestic importance, over the gorge of the river Lochini