Construction of new bridge from Kedia street to Javakhishvili turn on territory of Zugdidi Municipality, rehabilitation and reconstruction of Existing streets

In Progress
Category: Rehabilitation and construction of highway and railway bridges
31.12.2024

The design bridge crossing is articulated girder, 2-span structure, with a scheme 2X16.0m; In a plan, it is designed on a straight line, and in elevation on zero grade—the bridge clearance - 8.5+2X1.5m, the cross-section-12.70m, the total length 33.45m. The bridge has two abutments and one pier.

The design bridge spans will be overlaid with prestressed 16.0m-long reinforced concrete (so-called “composite”) girders. The bridge superstructure is calculated using A-11 and HK-80 loads.