Geo / Eng

PROJECTS

banner
ilustrator

Manufacturing of 40 and 60 ton load-bearing capacity Assembly bridges

Completed
Category: Rehabilitation and construction of highway and railway bridges
03.09.2023 - 17.07.2024

Manufacturing of 40 and 60 ton load-bearing capacity Assembly bridges