Geo / Eng

PROJECTS

banner
ilustrator

Manufacturing and installation of a steel structure within the framework of the construction of the international standard Tbilisi Ice Palace

Completed
Category: ლითონის კონსტრუქციების დამზადება -მონტაჟი
30.05.2024 - 19.09.2024

Manufacturing and installation of a steel structure within the framework of the construction of the international standard Tbilisi Ice Palace