Geo / Eng

PROJECTS

banner
ilustrator

Design and construction of new bridge crossing on existing canal of Shulaveri (Sh-161) - 6 (5 + 400) of the Tsiteli Bridge Road

Completed
Category: Rehabilitation and construction of highway and railway bridges
31.03.2020 - 21.12.2023
Design and construction of new bridge crossing on existing canal of Shulaveri (Sh-161) - 6 (5 + 400) of the Tsiteli Bridge Road