Manufacturing and installation of hydraulic water level regulating metal shutters
Completed
Category:
30.04.2024 - 02.05.2024
Manufacturing and installation of hydraulic water level regulating metal shutters
Similar Projects
Completed
Category:
01.05.2024 - 01.05.2024
Fabrication of metal structures for the HPP in Gudauri
Fabrication of metal structures for the HPP in Gudauri
Completed
Category:
02.05.2024 - 02.05.2024
Making pipes for the hydroelectric power plant on the Debeda River
Making pipes for the hydroelectric power plant on the Debeda River