Hydroelectric stations
Completed
Category:
02.05.2024 - 02.05.2024
Making pipes for the hydroelectric power plant on the Debeda River
Making pipes for the hydroelectric power plant on the Debeda River
Completed
Category:
01.05.2024 - 01.05.2024
Fabrication of metal structures for the HPP in Gudauri
Fabrication of metal structures for the HPP in Gudauri
Completed
Category:
01.05.2024 - 01.05.2024
Making pipes for Avan Hess
Making pipes for Avan Hess
Completed
Category:
01.05.2024 - 01.05.2024
Making pipes for Mtkvari HPP
Making pipes for Mtkvari HPP
Completed
Category:
01.05.2024 - 01.05.2024
Laying pipes for the hydroelectric power plant under construction in Svaneti
Laying pipes for the hydroelectric power plant under construction in Svaneti
Completed
Category:
01.05.2024 - 01.05.2024
Manufacturing and installation of water level regulating metal shutters
Manufacturing and installation of water level regulating metal shutters