Geo / Eng

PROJECTS

banner
ilustrator

Design and construction of new bridge crossing on existing canal of Shulaveri (Sh-161) - 6 (5 + 400) of the Tsiteli Bridge Road

Completed
Category: Rehabilitation and construction of highway and railway bridges
15.06.2023 - 08.02.2024
Design and construction of new bridge crossing on existing canal of Shulaveri (Sh-161) - 6 (5 + 400) of the Tsiteli Bridge Road